Sunday, August 18, 2013

Week 29 - Electrical Fit Offs/Floor Tiles completed

(08 July 2013 - 13 July 2013)

Tuesday 09 July 2013: Lights and Fixtures

Today, the electrcians were there to start the final fit offs and finished today. The electrical sockets and switches had been fitted off. They have installed standard bayonet light fittings and these will be replaced with energy saver down lights, Smoke Detector, Heat Combo.

Electricians at work
with Pillar Lights
Master Bedroom Beadhead Lights
Step Lights
Niche near the Power Room
Smoke Detector
Downlights
Balcony Lights
Switches
20 Downlights - Promotion from Metricon
Cable for CCTV Camera
Waterproof switch & Gas point in Alfresco
Waterproof Switch & Hot Water System line
Clipsal 3x2 Heat Combo
Wednesday 10 July 2013: Tiling Commenced

The tilers were busily working today. The main floor tiles has started.


Tile Preparation
Tiles Layed yet to be grouted
Family & Dining
Family Tiled
Friday 12 July 2013: Tiles completed

After two days of tile laying, the tilers returned to finish of their work. The tiles are grouted and is complete, yet to be cleaned and I must say I am happy about it.


Front Entry
Tiling completed & covered
Kitchen from Family
From Dining
Butlers Pantry & Laundry
Front Entry
Guest Room
Front Entry
No shoes permitted sign on the Front Door
Guest Room Entry
A few things left to do still;

- Carpet to Stairs
- Floor Boards Upstairs
- Shower Screens, Mirrors
- Accessories - Toilet Roll, Towel, Soap Holders
- Fly Screens
- Paint Touch Ups
- Internal Clean
- Installation of appliances on handover.