Week 28 - Fit Outs

(01 July 2013 - 06 July 2013)

Wednesday 03 July 2013: Downpipes/Cladding Painted

Today the Downpipes and cladding to the back of the house were painted..


Cladding Painted
Meter Box
and the Telephone, Gas and Hot Water System Meter was connected...


Gas Line
Telephone
Thursday 04 July 2013: Bath/Shower Fitting In

We are getting closer!! We have Taps, Toilets,Today we our bath, toilets and bathroom accessories fitted.


Pantry Tap
Laundry
Kitchen Sink & Tap
Powder Room
Ensuite Spa
Ensuite Spa closer View
Powder Room Shower
Ensuite Shower
Toilet
Main Bathroom Tub
Friday 05 July 2013: Air Condition Ducts/Vaccum/Security/Wardrobes In

More stuff was done today.....

All the Air Conditioning ducts have been added. As mentioned we are having just the ducts and will have the unit after handover. 

Air con Ducts
Ducted Vaccum - We have inlets near the Family, Master Bedroom, Study and Living.and the main unit fixed in the garage.

Vaccum Point
and the Hills Alarm System was installed too...


Alarm system Unit in the Linen Cupboard
Hills Alarm System

Alarm Sensor

Alarm External Siren
Fire Detector

We also had the sliding mirror doors and rails fitted to our Build In Robes...
Shelves and Rails in BIR
Mirror Sliding Doors with Bronze Trim