Tuesday, May 21, 2013

Week 20 - Gyprock & Stairs In

(06 May 2013 - 11 May 2013)

Monday 06 May 2013: Gyprock Started today

Gyprock has started today and it would take a few days to complete. The house seem to be bigger with the Gyrprock installed. It's amazing the difference it makes to the place with plaster over the frame, being able to see all the rooms come together, taking shape.
Bulkhead in Front Entry 

                                Corner Niche - Refrigerator Space & Butlers Pantry
                   
Bathtub

Master Bed Entry  

Garage Gyprocked

Tuesday 07 May 2013: Gyprocked & Plastered

The Gyprockers about 7-8 of them were back today and have pretty much completed the walls and have started on the ceilings and smoothed out the joins between sheets. 



Family Room (View from Dining) 

Balcony Roof

Rumpus Room View

Alfresco

Wednesday 08 May 2013: Plastering Continues & We have Stairs

We're guessing the next stage is to pull the electrical wires through. It took a few days between upstairs & down in putting the plaster up but all of the house has now been plastered. So too late now if we forgot anything like extra wiring or noggins etc.. 


We were very delighted to see our stairs delivered today.



Side view with ZigZag Trim


Top of the stairs - View from Living Room

Storage under the stairs


View from Front Entry

Thursday 09 May 2013: Cornices Delivered

Lot of progress this week. Just within a day, cornice has been fully installed.







Monday, April 29, 2013

Week 17 - Garage/Alfresco Roof on

(15 Apr 2013 - 20 Apr 2013)

Monday 15 Apr 2013: Garage Roof Installed

I noticed some tradies working on the Garage Roof today and they did finish the Garage Roof.






Tuesday 16 Apr 2013: Gutters to the roof of Alfresco on

The Gutters and Fascia went on above the Alfresco and Rumpus Room.


Wednesday 17 Apr 2013: Alfresco Roof Installed

Today, our roof tiles were started on the Alfresco. One thing I'm a little worried about is why they didn't finish the Alfresco roof tiles today. Hope, they will complete the roof tomorrow. 





Thursday 18 Apr 2013: No Action

I was hoping that the Alfresco roof will be completed today, but nothing happened. Not sure why?

Friday 19 Apr 2013: No Action Again

I tried to call the SS today to find out why nothing's happening. But couldn't get hold of him. Finally made it after a few attempts. The SS told me that they are going to redo the Alfresco Roof again on Monday, due to some problem with the roof tiles. Not sure what the problem is. Hope everything goes good.

Saturday, February 16, 2013

Week 07 - We have Windows

(04 Feb - 09 Feb 2013)

Monday 04 February 2013: Part Windows In

I went past the site this afternoon and windows were installed partially.

French Doors to Masterbed waiting to be installed
Wednesday 06 February 2013: Windows fully Installed


And all our windows were fully installed today.

French Doors & Windows in Bedroom 1
Rumpus room Window
Alfresco Bi-fold Doors
Thursday 07 February 2013: Nothing Happening

Went over to the house but nothing was done. Bricks was just sitting there. We were hoping that some work was done as it was good weather.  Hopefully tomorrow or on Monday.







Thursday, November 29, 2012

Contract Variations

Accepted the priliminary contract on 27th June 2012 and made some variations to the contract.

- Delete the two gables to front of elevation to the plantation facade.
- Raise the ceiling to 9ft to first floor and upstairs to 8.6ft standard.
- Reduce Rumpus room width by 720mmm wide x 3360mm long to increase Outdoor Room.
- Increase eaves to entire first floor extra by 600mm wide above standard 450mm.
- Additional external gas bayonet point to outdoor Room.
- Bulkhead to entry.
- Upgrade Sitting Room to Guest Room.
- Full height tiles to all bathrooms.
- Corner niche to fridge alcove corner of kitchen/family adjacent to stairwell.
- Convert Pantry to Butlers Pantry with additional Gas Cooktop, Oven and ducted Rangehood.
- Additional fridge space 1000mm wide x 740mm dep including cold water point in Butlers Pantry.
- Fridge space in the kitchen to remain to add shelving and glass door for future showcase.
- Centre Aluminium sliding window to rear elevation of Rumpus Room.
- Reposition Master Bedroom bedhead wall towards retreat to provide thick nibs to both ends of walls    towards robe for future Dressing Table.
- Flush panel cavity sliding doors to front of Ensuite.
- Ducts only for future Air Conditioning.


Dressing Table at the back of the Bedhead

Corner Niche next to Refrigerator
Rumpus Room will be converted to Theatre Room similar to this

Fridge Space in the kitchen to be converted as this

Round Vents for Air Conditioning
- Ducted Vaccum
Ducted Vaccum

 - Upgrade to Rinnai Infinity 32 Gas Hot water system in lieu of standard.


Rinnai Infinity 32
 Our next appointment was the interiors, colours, kitchen and electricals on 29 August 2012.