Sunday, August 18, 2013

Week 29 - Electrical Fit Offs/Floor Tiles completed

(08 July 2013 - 13 July 2013)

Tuesday 09 July 2013: Lights and Fixtures

Today, the electrcians were there to start the final fit offs and finished today. The electrical sockets and switches had been fitted off. They have installed standard bayonet light fittings and these will be replaced with energy saver down lights, Smoke Detector, Heat Combo.

Electricians at work
with Pillar Lights
Master Bedroom Beadhead Lights
Step Lights
Niche near the Power Room
Smoke Detector
Downlights
Balcony Lights
Switches
20 Downlights - Promotion from Metricon
Cable for CCTV Camera
Waterproof switch & Gas point in Alfresco
Waterproof Switch & Hot Water System line
Clipsal 3x2 Heat Combo
Wednesday 10 July 2013: Tiling Commenced

The tilers were busily working today. The main floor tiles has started.


Tile Preparation
Tiles Layed yet to be grouted
Family & Dining
Family Tiled
Friday 12 July 2013: Tiles completed

After two days of tile laying, the tilers returned to finish of their work. The tiles are grouted and is complete, yet to be cleaned and I must say I am happy about it.


Front Entry
Tiling completed & covered
Kitchen from Family
From Dining
Butlers Pantry & Laundry
Front Entry
Guest Room
Front Entry
No shoes permitted sign on the Front Door
Guest Room Entry
A few things left to do still;

- Carpet to Stairs
- Floor Boards Upstairs
- Shower Screens, Mirrors
- Accessories - Toilet Roll, Towel, Soap Holders
- Fly Screens
- Paint Touch Ups
- Internal Clean
- Installation of appliances on handover.




Thursday, August 8, 2013

Week 26 - Painting Started

(17 June 2013 - 22 June 2013)

Monday 17 June 2013: Internal Doors In

We had the carpenters today to install our internal doors. architraves was completed but they installed only the Ensuite, Master Bed and Storage Door. 


Ensuite Cavity Door
Skirting
Master Bed Door
Saturday 22 June 2013: Balcony Rails Installed/Painting Commenced

Went past the house today and saw the tradies already at work. The balcony railings have been installed.


Balcony Rails
Front View
and we also saw that the painters were inside the house painting the roof in Dulux Beige Royal Half and the wall colours will be painted in Dulux Beige Royal.....and painting continues next week.....


Roof Painting








Week 24 - Tiling Completed

(03 June 2013 - 08 June 2013)

Monday 03 June 2013: Laundry/Ensuite Tiled 

Today the Laundry wall was tiled and grouted. And also the Ensuite wall tiles were grouted. The grout is the same as the tile colour. 

Laundry Tiles
Laundry
Ensuite
Ensuite Shower
Ensuite Tub

Tuesday 04 June 2013: Powder/Main Bathroom Tiled 

Tiling to the wet areas are complete now. Bathrooms are looking good. Our neutral floors and walls look nice. 

The site supervisor called in today to give us the weekly update but still unable to tell us when we will receive the keys.

Powder Room
Main Bathroom
Wednesday 05 June 2013: Balcony/Alfresco Tiles 

The tilers completed the Balcony and Alfresco tiles today. We kept the same tiles to both.
Now that the tiling is completed, I think the next stage is painting. I am happy with the result and our choices.

Balcony
Alfresco




Tuesday, August 6, 2013

Week 22 - Wet Area Tiles Delivered

(20 May 2013 - 25 May 2013)

Monday 20 May 2013: Waterproofing Completed

Waterproofing to the wet areas was completed...


Tuesday 21 May 2013: Laundry Benchtop & Sink In

Laundry Benchtop and sink were in. 

Overhead/Broom cupboards - Laminex Nocturne Oak
Under bench cupboards - Mushroom Linea
Benchtop - Laminex Cocoa Nougat.
Laundry Trough/Sink - Clark Flat line stainless steel 48 Litre (upgraded) single bowl. 

We are not happy with the benchtop, does not match the under bench cupboards. 


Laundry Benchtop

Laundry
Wednesday 22 May 2013: Rainy Day...Nothing Happened

Thursday 23 May 2013: Drip..Drip...Drip

We visited the house today and found water leaking in the Rumpus Room and Kitchen. We raised this with the SS and he assured us that this will be fixed. Good thing it rained continuously and the issue was highlighted.

Rumpus Room
Rumpus Room
Kitchen
Friday 24 June 2013: Cement & Tiles Delivered

We had the sand and cement delivered today for the Wet Area tile bases.


and the site was clear of rubbish...

and the wet area tiles were delivered today..

Wet Area Floor Tiles
Wet Area Wall Tiles

Alfresco/Balcony Tiles
These are the tiles for our Balcony and Alfresco - very happy with the colours. It is very difficult to make our decision at the showroom during selections.

Hopefully the tiling will start next week.