Tuesday 09 July 2013: Lights and Fixtures
Today, the electrcians were there to start the final fit offs and finished today. The electrical sockets and switches had been fitted off. They have installed standard bayonet light fittings and these will be replaced with energy saver down lights, Smoke Detector, Heat Combo.
![]() |
Electricians at work |
![]() |
with Pillar Lights |
![]() |
Master Bedroom Beadhead Lights |
![]() |
Step Lights |
![]() |
Niche near the Power Room |
![]() |
Smoke Detector |
![]() |
Downlights |
![]() |
Balcony Lights |
![]() |
Switches |
![]() |
20 Downlights - Promotion from Metricon |
![]() |
Cable for CCTV Camera |
![]() |
Waterproof switch & Gas point in Alfresco |
![]() |
Waterproof Switch & Hot Water System line |
![]() |
Clipsal 3x2 Heat Combo |
The tilers were busily working today. The main floor tiles has started.
![]() |
Tile Preparation |
![]() |
Tiles Layed yet to be grouted |
![]() |
Family & Dining |
![]() |
Family Tiled |
After two days of tile laying, the tilers returned to finish of their work. The tiles are grouted and is complete, yet to be cleaned and I must say I am happy about it.
![]() |
Front Entry |
![]() |
Tiling completed & covered |
![]() |
Kitchen from Family |
![]() |
From Dining |
![]() |
Butlers Pantry & Laundry |
![]() |
Front Entry |
![]() |
Guest Room |
![]() |
Front Entry |
![]() |
No shoes permitted sign on the Front Door |
![]() |
Guest Room Entry |
A few things left to do still;
- Carpet to Stairs- Floor Boards Upstairs
- Shower Screens, Mirrors
- Accessories - Toilet Roll, Towel, Soap Holders
- Fly Screens
- Paint Touch Ups
- Internal Clean
- Installation of appliances on handover.