Saturday, November 24, 2012

Walk through and Deposit paid

We made some variations to the contract:

Accepted the priliminary contract on 27th June 2012. The tender experience was a bit up and down, there was quite a number of mistakes. We went through a lot of alterations to make sure every variation was listed on the final tender. So the next day we sat down with the sales consultant who walked us through the house, verified all the standard inclusions and listed out the options. We literally went through every item and made some variations.

Floor Plan:

Floor Plan
Nolan Exploded View 

No comments:

Post a Comment